Spotted in Yahoo news, does anyone have a confession to make?!!

Meanwhile, in Australia, a piece of Banksy artwork valued at around \$50,000 (£31,100) has been accidentally destroyed by builders.

The parachuting rat was painted about 15 years ago on a wall in Prahran in Melbourne and has been a proud fixture of the area ever since.

However, it was ruined when builders smashed a hole so that they could put new pipes into the building.

Resident Tina McKenzie told ABC News Australia: “They’ve sawn into the side of the building without actually saying anything.

“But then, that’s builders… they wouldn’t even think”

Ms McKenzie has had dealings with Banksy, and said she was going to send him an email to say a TV crew had been out to film the incident.

When asked what he would do she said: “Well, he would probably laugh that there’s so much attention around something that he’s just done as a part of his lifestyle every day!”j

Categories: Uncategorized Tags: ,

Assistance Required: Design guidance on Cryogenic system

17/05/2012 4 comments

To Mark/Jim and others who are interested

At the moment I am working on a design check of a liquid nitrogen cryogenic system.

The exact questions / issues that I am looking into are:

1. Standards / Regulations / design guidance as to the materials to be used for the liquid nitrogen line and the cyrovent line.

2. Standards/Regulations for frequency for Cryovent cut ins on Liquid Nitrogen Line

3. Standards / regulations of venting liquid nitrogen boiloff

 I have looked at ASHRAE refrigeration guide Chap 47, but this does not seem to have the answers I need. the others around me aren’t sure where else to go.

THe Sub-contractor who is installing the system seems sure of themselves and is stating the original design was inadequate and it should be installed the way they are doing it (which oddly costs more).

(Definition of Cryovent – a port that allows the boiled off nitrogen to escape.)

Categories: Ben Hancock, Journal

May 16 Commissioning and Transfer of focus to USAMRIID

16/05/2012 1 comment

In brief

I have been finishing off various items within the handover of the Steam Sterilization Plant, and starting to get more stuck into more aspects of the main USAMRIID project

Key Interesting points

Snagging and deficiencies lists within SSP.

We have generated a comprehensive snagging list for the SSP, and the discussion about what is exactly stated in the specification has ensued. It is interesting that despite the fact that no 5% retention is held no one is concerned that the contractor will not make good his mistakes, this is due to the power that the federal government (Us) has to command them to work, and the fact that it is essential for the contractor to stay onside with the Corp of Engineers for continuing work.

Testing of PALL filters.

In order to filter the high pressure steam the other gaseous waste from the SSP, HEPA filters are used to clean the air. These operate at high pressure and high flow rates. The testing of these filters has taken 3 weeks, due to the complex nature of the filter skids, and the fact that the method of testing has had to be changed several times to find a test that will allow the filters to pass. We have had to ensure ourselves then reassure the client that the “easier to pass” tests do give the same level of assurance and will be repeatable within their operation and maintenance schedule.

Investigating “Leak in system”

Within the SSP all non expected liquid waste is drained down to the basement, from where it is pneumatically lifted to the storage tanks on the top floor, ready for processing with the other effluent. The receiver/ejectors in the basement have been firing more than would be expected, and so I have been researching to try and find a plausible source of the water, as we were concerned that it might be a symptom a larger problem.  Having isolated an onsite Auto-Clave this appears to have prevented the consistent leak, and so this more easily fixed than we had feared.

Design Alteration to the SSP

As mentioned in previous Blogs a design fault has been recognized, and is in the process of being corrected. In the meantime most of the other work has been finished to the original timeline, and so is nearing completion. A difficulty has arisen in so far as the contractor wants to know whether they are to hand over the building now as originally agreed in the contract and the original design, or continue maintenance of the facility for a few months until the design change is finalized and complete, and so they can hand over a fully working facility. Clearly either of these two options causes costs, and have their own advantages and disadvantages. Trying to extract these costs from the design contractor is apparently unlikely to succeed due to the contract style employed by the Corp of Engineers and federal Government.

 

USAMRIID

Duct Testing

Conducting and signing off the pressure tests of the installed air ducts – ensuring that they are adequately air tight,

Coating Application

Due to the higher heat and humidity than would be seasonably be expected it is causing some concern for the application of coatings. These are quite sensitive to atmospheric conditions, and it has been agreed in the contract that within selected high containment (high value)  areas they will be monitored, this has worked for these selected areas, however the non monitored areas are noticeably less controlled and a lower quality of finish is achieved.

It has been decided that the cheapest and easiest way would be for the Corp to monitor all the others areas with HOBO data loggers, and then provide this information to the contractors. This is another example of the Corp assisting the Contractor more than might be usual, and so at least from our side the partnership relationship seems to be going well!

Partnering

Having observed different members of the contractor and Corp interact it has become clear that the “partnering” spirit is mostly more visible in the Corp (probably due to the more relaxed approach to budgets), and also very highly personality dependant. It appears that the Latham report has not been fully read and digested by the older members of the contractors. Partnering with someone who does not want to reciprocate seems in some ways to be worse than both being adversarial, and both playing the same game.

Lack of Shop Drawings

In some of the areas of the USAMRIID project the Corp have allowed the contractor some flexibility of the detailing, in order to allow them to find the most cost effective solution at the time of construction. This is now causing some difficulties as the contractor is now unable or unwilling to provide shop drawings, and so signing them off as an acceptable method is difficult, as are inspections. This is leading to some disputes where the contractor is stating that our lack of movement on the inspections is delaying them, but we are in turn waiting for the shop drawings in order to do the inspections. They seem to be obstinately not listening!

 

Valve Access

Due to the high density of services within the USAMRIID there are many places where it is difficult to get to the commissioning and isolation valves of the mechanical system because other systems have since been placed in the way. This is clearly unacceptable and will also be very costly to correct, due to the number of places where it has occurred. This does seem to be an elementary error, that should really have been stopped before it got this far, however the number of services will make any solution difficult to implement. I am considering suggesting the use of highly trained monkeys for the O&M crew, as they will be smaller and also able to climb on the ducts.

 

What have I learnt?

Valve access

As early as possible in the design process the maintenance of the plant must be considered, otherwise it is doomed to fail. Within this project it would probably have led to even more services floors, and a higher price-tag so would have been inevitable. A full 3D services plan would have helped for the visualization of services clashes.

Testing and Commissioning

Do not underestimate the time and budget required for the testing and commissioning, especially on complex projects. Problems will be found, this is the point of the process. Ensure there is a plan in place for making larger and time consuming alterations.

Coating Application

The sheer act of monitoring will increase the level of workmanship, as long as it is done across the board and against clear and relevant criteria.

Partnering

Can be effective, yet the stick is also still required at times. Try to imbue a partnering attitude from as early on as possible, and work hard to maintain this.

Categories: Ben Hancock, Journal

Flexibility is a principle of war…..

14/05/2012 2 comments

So first day back in to work today after paternity leave to find my desk stripped out, someone else sat there and being told that I’ve been moved projects. A happy start at 0530!

I am now a project engineer on the MOF project doing a direct swap with one of the graduate engineers so that I can get some on-site experience.  Not an issue and hopefully beneficial for my DOs.

I will now be running the concrete works which is abutments, capping beams and pile caps.  Good stuff with lots of reinforcement detailing to get my head into. Transition period of 2-3 weeks as we hand over responsibilities and get up to speed.  If only there was someone on here that was sharing their lessons on RC….

More to follow once I have a clue what’s going on as there appears to have been little planning conducted so far.

WRT the desk issue I have now turfed out the individual sat there, reclaimed it and am beavering away once again!

 

Categories: Roy Serevena

Steady away..

EDC SOLARWALL

As everyone is on time codes around here, they get protective over them and I had to kick the authorising office to release funding for our ConRep here on site to book his time to. I get a distinct feeling that if this had not happened then we would find ourselves locking horns further down the line trying to justify the hours. Thankfully HRH The Queen has not asked for a time code and my time remains free of charge to USACE unless I can come up with a cunning plan to make some money out here…..

During the weekly meeting I enquired about the findings of the investigation of the existing wall construction and the contractor made an almighty slip up in blabbing about extra costs and the conversation quickly turned into a regain when they realised the Client was listening in. The phrase – “please stop talking you’re scaring scaring the government” really made my day. The contractor was invited to consolidate his (collective) thoughts on how best to approach us with cost variations instead of just banding ideas around in an open forum. Have heard nothing back as yet, but having reviewed the documentation it looks like the cost will be materials based. This highlights the beauty of the ‘option’ system of bidding within a government environment. It allows a bid price to be put in with several options, meaning that whatever level is actually approved can be spent and in instances such as this, the options can be tweaked to make sure you still get the best value for money without the whole project falling through.

I have also been coordinating potentially useful information for the contractor to use when compiling his method statements (de-conflicting site specifics and coordinating with facility managers and trying to pre-empt what they will need.) This is in the hope that subsequent submittals will be approved without the need for further comment and keep the timeline on track.

Reviewed design submittals – approved with comments back to contractor.

ECIP Project – Bldg 732 / 760

Attended kick off meeting for the installation of Solarwall on 2 other buildings on the depot. These are in concept phase and Rob Duke is involved from the E&M side of life.

School Visits

Have volunteered to take part in the outreach programme to go and promote science and engineering in the local schools. My first assignment is a careers day at a Baltimore Middle School – 12 – 14 yr olds, due to take place on 1 June. Further events will be planned provided I don’t get arrested at the first event.

Ashley Reservist Centre

Undertook further investigation and data collection for use in TMR1. Suicide level increasing.

And in other news….

This feature is temporarily cancelled due to lack of interest….

McFry – Out.

Categories: Mat McFry, Uncategorized

Week 6 7th 1 11th May 2012

Week 6.  7th – 11th May 2012

Bank Holiday weekend – well, I took the Monday morning off (recovery from a 125 mile bike ride in the snow, and a 20 mile run up some mountains), so that was nice!

But what else, I hear you say?  Well, the week was very much focussed around my Runcorn study into Distributed Engineering which has changed with time as my research developed.  What began with an investigation into methods of Cost Reporting and Cost Estimates – these being the much heralded excuse for delays from PSN’s Runcorn Design House, my recommendations came back saying that:

  • Communications between Project Managers is excellent
  • Current Cost Reporting methods are suitable; delays are inevitable and this can be relieved by a few more Cost Engineers in Runcorn

But more surprisingly (and damningly),

  • The leadership from the PSN Aberdeen Delivery Manager and his Delivery Focal Points is weak
  • The Delivery Manager in Runcorn needs to play his part as a leader better, and get himself a Project Services team ASAP
  • If they don’t start working on morale, and make the (Runcorn) team feel like part of the Focus Project, they’re going to lose them, fast!

We sometimes forget how good people management is in the Army (compared with PSN, anyway!) 

Some context…  BP contract most of their design work to Wood Group PSN (abbreviated to PSN), who work alongside us (BP’s Projects and Mods Team) in Aberdeen as part of the Focus Project (fully integrated etc etc).  Because there is such a huge demand for work, they have a ‘third floor’ of the building situated in Runcorn, Cheshire, which currently employ 72 staff (compared to ~130 in Aberdeen).  A bunch of us from BP and PSN visited for a conference on Tuesday and frankly I was shocked.  The BP staff all got there on the red-eye flight, met the PSN guys in their office and put faces to the voices we’d been dealing with on the phone; really good stuff and great for cementing relationships that you can’t do by email.  The PSN guys rocked up late for the meeting, and didn’t even meet the main part of the team in their office, just the key management in the conference room.  And then were all out of there the next day at lunch, cutting a meeting short to do so!  We (BP) were there til mid-Wednesday afternoon and so could chat through all the bits and pieces; or use the wireless to crack on with routine work otherwise.  With this being the first conference of its type in Runcorn (the office was established in June 2011), most of the PSN (ABZ) contingent had never been there and seen the offices.

So one of my Programme Managers asked me my opinion, and I told it was all pretty piss-poor and bad mannered really; we’re all supposed to be the Focus Team, but PSN (ABZ) clearly didn’t give a flying fook about their staff in the South, who it transpired were kept massively in the dark on the big picture and thought it was all doom and gloom on the forecast (it’s not, its booming and they’ll be expanding!).  And clearly, that’s no way to run a team.  I continued to say that unless they bucked their ideas up they’d be haemorrhaging staff when better options come along (which is likely as there’s a big engineering boom around there).  Oh, and also that the presentations were pretty lame, there was no clear aims of agenda, the IT broke down (at one point their Plans man was talking with an A3 graph held up in front of his face) and they should be embarrassed.  So guess who gets to lead the next one!  Me and my big mouth…

The weekend – TMR writing and a bit of open water swimming at Loch Morlich – bloody freezing, but good training for the CELTMAN!!!!  See www.justgiving.com/chriswarner for more information 🙂

Categories: Chris Warner, Journal

Question for QS – Post Tensioning Rates

Roy/Greg – I would be grateful if you could have a look in spons for the rate for Post Tensioing work, Supply and Install (somethign along the lines of a price /m of tendon or beam would be outstanding).

My Tender Plan is getting finalised and I start pre tender meeetings with the Sub Contractors on Tueday and I would like a starting point on price.

Many Thanks

Steve

Categories: Uncategorized

Week 9 – Paternity Leave and a bit of temporary works design review

12/05/2012 2 comments

So this week I have mostly been on paternity leave.  This has simply added a new string to my “work avoidance” bow with an upcoming TMR deadline.  That said, I have managed to do the little and often approach, although not as often as I would have liked!  Harrison is now 15 days old, doing well (as is Lisa) and Team Serevena is semi ready for my return to work.

I did spend a day in the office this week and after the many back pats and congratulatory pleasantries (I really didn’t do a great deal) spent Thursday undertaking a design review of the Jetty temporary works.  I needed to be in as one of the discussion points was the pile testing, the part of the scope that I am solely responsible for (and this ties in neatly with my thesis proposal – I love it when a plan comes together!).  As well as the pile testing, we also looked at the traveller in detail, including the construction sequence, operation and reconfiguration for phase 2 of the Jetty trestle installation.  Several areas of concern worked through but no pressing challenges relating to the traveller for me to raise in this forum.

The only potential challenge that I’m open to suggestions for is how to splice piles and their reo cages when working over the water. Concept is to drive a 30-32m section which is as long as we can drive with the likely barge/crane configuration and then have to undertake a vertical splice of the last 10-14m pile section.  Typically this would be done in a nice jig but it’s not that easy on this occasion. Thoughts welcome from one and all.

That’s about it really this week.  I return to work on Tuesday, CIs visit at the start of the following week and then pedal to the metal with pile testing for me! (Although we still don’t have any idea of a start date – we’ll be poised like coiled springs)

Categories: Roy Serevena

Good News Everybody!

Exciting news, I moved into a new flat last night. Within 2 minutes, I was greeted by one of the neighbours.  I was initially a bit wary of the 6’4, 120kg maori approaching me in the dark corridor but was soon put at my ease.  He and his wife even helped me unload the car – unlike the neighbours at the old place they actually put the stuff in my house.

Categories: Dan Knowles

Quick SolarWall Update

Hobbit 108 asked for some adfditional info on this stuff. I have been given a link to a web site that follows live data from a building that has this installed. It may offer a semi hardon to those inclined that way, but not for me. Rob Duke may be doing a TMR on something like this as he’s getting involved in some actual design (design being…step 1 – fit solar wall – step 2 – enjoy.) I also have some other docs for you to have a look at but haven’t yet figured out how to put pdf’s on here.

https://www.hobolink.com/p/19ce52151e42cc6c8fa66fdca93b35db

Laters.

Categories: Mat McFry, Uncategorized